We have carried out Under water survey of Upstream face of Almatti Dam and Bathymetry of Stilling basin at the Downstream face of Almatti Dam.
Underwater ROV Inspection - Video inspection to assess the condition of the upstream face of the dam that are submerged in water.
Trusted Consultant and Construction Since 2015